Pdf chapter 14 game theory and strategic behavioral. Fudenberg, Drew, David Levine, and Eric Maskin. 6 (1991): 1713–33. Following is an excerpt from. Though the AAI had asked the State Government to make available a total of 815 acres of land for the airport project, the latter had requested the AAI to scale down the land requirement since maximum 734 acres are available in the area. Project Monitoring Group Additional Secretary in Prime Minister's office Arun Goel today expressed satisfaction over the progress in the implementation of various projects in Odisha. Highlight the two extracted files, then press the “Ctrl” and “C” keys at the same time. Driver converter stick ps2 iso game. Copy the two new files to the “C: ” root directory or folder of your hard drive. ![]() Now, the State Government has assured the AAI to provide additional land of around 40 acres for upgradation of the airstrip. Patnaik said the 40 acres of land would help construct a 6,000-feet-long runway. The district Collector has been told to identify suitable land and clear the encroachment, if any, before handing over the land to the AAI. Although the above is a good step, considering the important of this airport towards well-rounded development of Odisha. It needs to move faster. Following is an excerpt from. The state government has started work on development of a railway corridor through Choudwar to Rourkela to allow ease of inward and outward transportation of goods from the industrial hubs and mining belts along the region. Land acquisition for the project, the first of its kind initiative by a state government, has already been initiated by the Industrial Infrastructure Development Corporation (Idco). The project would go on ground after the land acquisition and is targeted to be completed by 2015, said Idco CMD Priyabrata Patnaik on Friday. The corridor involves development of extensive rail and road connectivity, along with provisioning of water supply and other infrastructural facilities. The corridor would encompass two track railway lines and six-lane road passing through the industrial hubs and the coal mining belts. New industrial areas and downstream units would be developed along the corridor. Common infrastructure facilities under the corridor would solve the problems of inward and outward transportation of goods and minerals. The stretch would pass through the heart of coal mining operations in the state, which harbours about 65 billion tonne of reserves. The coal reserves in the Talcher belt only is around 43 billion tonne. The corridor would cover 17 large and mega-industries, along with 57 other units, through the stretch from Choudwar to Rourkela. Traffic projection on the route is given out as 8.7 million tonne. Fontspace. The route would have 163 km of railway track length and 465 km on road. As many as 308 minor bridges and 77 major bridges would have to be constructed on it, said Patnaik. Note 1: The 163 km of railway track probably refers to the Talcher-Bimlagarh segment. Note 2: Although the above report only mentions the Choudwar-Rourkela part, in earlier documents there is mention of Paradeep-Choudwar-Rourkela industrial corridor. See for example. Following are some excerpts from that. The Orissa government plans to develop an industrial corridor running from Paradeep to Rourkela through industrial hubs like Choudwar, Talcher and Sambalpur. Though the initial proposal was to have an industrial corridor originating from Choudwar to Rourkela, the proposal was modified to extend the corridor till Paradeep to allow inward and outward transport of goods through the Paradeep port, sources said. The proposed industrial corridor will be in line with the Delhi-Mumbai Industrial Corridor and is designed to pass through national highway no.42 and national highway no 5 (A). Under the project, both road and rail corridor will be developed, which will be the backbone of the proposed project.
0 Comments
Leave a Reply. |